How we calculate an estimate
Three axes
What we calculate with
Three things set the number.
Scope of automation
Smaller for a single task, larger for a whole department's workflow.
Systems to integrate
Smaller with nothing to connect, larger when several systems must be linked or screens driven directly.
Document and data format
Smaller when data is already in tables, larger for handwriting, photos or inconsistent forms.
Included
- Workflow mapping and requirements
- Screen design
- Development
- Acceptance testing
- Deployment
- Post-acceptance defect support
Billed separately
- Cloud usage fees
- External API and AI model usage fees
- New requirements added after kickoff
- Operation and maintenance beyond the free warranty period
What raises it
Six things that move a quote
Closed network or on-premises deployment
External AI models cannot be used, so the architecture itself changes, and the procedures for importing and exporting data add to the schedule.
Target system exposes no interface
We have to drive its screens instead, and every time the target system changes a screen, we have to adjust.
Inconsistent source formats
Exception branches multiply. This is the single most common reason estimates go wrong.
Required accuracy guarantees
Collecting verification data and tuning repeatedly is separate work.
No test environment
If it can only be checked in production, working windows shrink and the schedule stretches.
Multi-department approval
The time it takes to settle requirements and pass acceptance grows regardless of development effort.
Contract terms
Stated up front
Source code
Source for the deliverables transfers on final payment by default. What counts as a deliverable is fixed against the requirements at the contract stage.
Warranty
The contract specifies a free warranty period that starts when acceptance is complete. What counts as a defect is defined in the same document.
Operation and maintenance
We keep operating the system after the free warranty period ends; only the contract is new. We do not attach a fixed percentage of the development cost — we price the hours the scope you hand over actually needs.
Your data and business rules
We do not use the data and business rules we receive on a project for another client’s product or for model training. We put reuse boundaries and the scope of confidentiality in writing at the contract stage.
Where to start
You can start small
You can start with a diagnosis or training only, or build one task first.
- 01
Free assessment
The first call, workflow assessment and report cost nothing.
Deciding what to change first - 02
Assessment or training only
Contract an adoption plan or employee training without a build.
Internal review · skills first - 03
Prototype
We build one task first with no upfront deposit. The work is included in the final quote (not free).
Checking we see the same picture - 04
Project build
A total priced from scope, integrations and data form.
You know what to build - 05
Monthly operations
Hand over monitoring and improvement after launch, month by month.
It needs ongoing care
Questions
Common questions
We confirm three things — the scope of work to automate, the systems to connect, and the document and data formats — then size the effort and add any complexity factors that apply. We quote a project total, excluding VAT.
A number given before the scope is clear hardens into a benchmark, which makes an honest quote awkward for both sides later. Once we confirm those three items in the consultation, we size the work and tell you right away.
We have no standard project duration. A rough number given before the requirements are clear gets treated as a promise. We confirm the scope first, then tell you.
Source for the deliverables transfers on final payment by default. What counts as a deliverable is fixed against the requirements at the contract stage.
The contract specifies a free warranty period that starts when acceptance is complete. We separate defects from new requirements by the acceptance criteria: if it does not behave as agreed, that is a defect; adding behavior that was never agreed is a new requirement, and we scope that separately.
Not as a fixed percentage of development cost. Basic fault handling and running the system for you are very different commitments, so we measure the hours your scope actually needs.
No. We simply do not take a deposit up front, and the work built at this stage is counted in the final quote. We begin it once you accept the preliminary estimate, and its purpose is to confirm that both sides are picturing the same thing.
It does not have to. Documents such as purchase orders and contracts, which carry counterparty names and unit prices, are often rejected in internal review, so we can design for a closed network or on-premises deployment. Before work begins we document what data leaves and what stays inside.
No. The first call, the workflow assessment, and the assessment report with priorities and an adoption plan all cost nothing. Timeline and cost come after the scope is set, not from the assessment itself.
If something is still unclear, ask us directly.
Request a free assessmentAsk for an estimate for your work
Confirm the three axes on a first call and we'll tell you the scale right away.